Access & value · Calgary
Basement Side Entrances
A below-grade entrance changes how your basement works. We approach the opening, support, stairs, retaining walls, and water management as one coordinated system.
When to contact us
Start with what you see—and what you want the property to do.
- You are planning independent basement access
- The entrance must work with existing grading and drainage
- You want a clear scope from excavation through final review
Related project evidence
See the work in context.
These selected UCS Projects cases are related to the service. Open a case to see the process, details, and full image set.

High River · Basement entrance
Access, concrete, and the foundation opening in one sequence.
A selected project view showing how below-grade access is coordinated around the existing home.
Open case study ↗
Calgary area · Side entrance
A finished guardrail and concrete route below grade.
See the construction stages and the finished elements together in the full case study.
Open case study ↗Typical scope
What the project may include.
Final scope depends on the property and is confirmed after review.
- 01Site review and project planning
- 02Excavation and access preparation
- 03Reinforced concrete stairs and retaining walls
- 04Door opening, lintel, and installation coordination
- 05Drainage and waterproofing details
- 06Final grading and site clean-up
Common questions
Useful context before the estimate.
Does every side entrance require the same scope?
No. Soil conditions, access, foundation construction, grading, and the desired opening all affect the work. We review the site before confirming a scope.
Can you handle the project from excavation to finish?
UCS Projects plans the work as a complete sequence so structural, drainage, and finish details are considered together.
Next step