Control the water · Calgary

Drainage & Waterproofing

Good below-grade work depends on where water goes. We consider slope, drainage paths, waterproofing transitions, and surrounding materials as part of the build.

When to contact us

Start with what you see—and what you want the property to do.

  • Water collects close to the foundation
  • A below-grade entrance needs dependable drainage
  • You want to prevent a finished project from creating a new water path

Typical scope

What the project may include.

Final scope depends on the property and is confirmed after review.

  1. 01Review of grading and water movement
  2. 02Drainage planning for the project area
  3. 03Waterproofing at relevant below-grade surfaces
  4. 04Transition and penetration detailing
  5. 05Backfill and surface-material coordination
  6. 06Final slope and drainage review

Common questions

Useful context before the estimate.

Why include drainage in a side-entrance project?

The entrance sits below grade, so water must be directed and managed intentionally rather than allowed to collect beside the foundation.

Will decorative gravel solve a drainage issue?

Surface material alone is not a complete drainage strategy. Slope, base preparation, discharge, and below-grade details must work together.

Next step

Tell us about the property and the result you need.

Start project request
CallFree estimate